Underhill Lane, Clayton – from 8th Aug 2016 – Construction Traffic

There will be large lorries of spoil being transported from Puck’s Lodge (beside Holt Valley Farm) eastwards to Beacon Road. Contractors will start on Monday 8th August but we have no idea for how long (a swimming pool is being installed).
As there are no passing spaces large enough there will be a manned traffic arrangement while each lorry is in transit. The lane should theoretically be rideable but you may be asked to wait at either end of the road stretch while a lorry traverses it.

This entry was posted in News. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

Captcha - case-insensitive

Enter the image's characters in the box above.
Click the image to try another one.